West Hollywood Extended Hours Permits Map of Active Extended Hours Permits




Permit Number Scope of Work Date Time Location Description Permit Conditions
EHR21-0143 Non-noisy work to be performed during the hours of 7am and 8am (i.e. layout, setup and preparation, maneuvering materials/ tools/equipment to the designated work location). No jackhammering, use of noise emitting tools, or hammering of concrete will be performed prior to 8am throughout this duration. Pour Phase 2 and 3 grading. landscape, electrical underground, light poles ARC and North bldgs. finishes paint, flooring, wood floor gym, plumbing fixtures restrooms and light fixtures DUE TO COVID-19 ALL WORKERS MUST WEAR FACE MASK AND KEEP 6 FEET SOCIAL DISTANCE 7/12/21 thru 8/13/21 7am-8am 8750 El Tovar "CODECOMPLIANCE - Work shall be done in a manner that is as minimally disruptive to the surrounding community as possible.Any work taking place not specifically approved by an extended hours permit will result in the revocation of this permit. Work shall be done in a manner that is as minimally disruptive to the surrounding community as possible"
EHR21-0152 ACCESS MANHOLE TO SPLICE FIBER CABLE (A023WEJ) 8/23-27/2021 10PM -6AM 8601 SUNSET BLVD "CODECOMPLIANCE - Work shall be done in a manner that is as minimally disruptive to the surrounding community as possible.Any work taking place not specifically approved by an extended hours permit will result in the revocation of this permit."
EHR21-0155 Crew to replace pole next to City Hall on Sweetzer. 8/14/21 9:00 AM - 6:00 PM 1037 Sweetzer Ave. "CODECOMPLIANCE - The approved hours are from 9AM to 6PM.Written notice shall be provided to all affected customers informing them of the nature of the planned work, the expected impacts (noise, traffic, etc.), the days and times of the work, and the contact information of an on-site supervisor who will immediately respond to and address any complaints received.Work shall be done in a manner that is as minimally disruptive to the surrounding community as possible."
EHR21-0154 ACCESS MANHOLE TO SPLICE FIBER CABLE (A0249R3) 08/23 - 08/27 10PM-6AM on SMB b/w SWEETZER AVE. AND KINGS RD "CODECOMPLIANCE - Work shall be done in a manner that is as minimally disruptive to the surrounding community as possible."
EHR21-0153 Split Lane closure with 265 ton crane to set Tower Crane onto job site. 9/13/21 7am to 7pm 7617 SMB "CODECOMPLIANCE - Written notice shall be provided to all neighbors within 500' radius of the project informing them of the nature of the planned work, the expected impacts (noise, traffic, etc.), the days and times of the work, and the contact information of an on-site supervisor who will immediately respond to and address any complaints received. The written notice shall be posted at the properties and send a copy of such notice to Code Compliance Division.Work shall be done in a manner that is as minimally disruptive to the surrounding community as possible.Any work taking place not specifically approved by an extended hours permit will result in the revocation of this permit., ENGINEERING - The extended hours request is approved, but they have to also submit a traffic control plan for review and possible approval. The application says that they want to close 3 westbound lanes on Santa Monica Blvd. There are two westbound lanes and two eastbound lanes and they need to maintain t"
EHR21-0157 Non-noisy work to be performed during the hours of 7am and 8am. (no equipment, no excavation no work noise). San Vicente Street tie-in underground storm drain main line DUE TO COVID-19 ALL WORKERS MUST WEAR FACE MASK AND KEEP 6 FEET SOCIAL DISTANCE 8/9/21 thru 8/27/21 (Mon. - Fri.) 7am-8am 8750 El Tovar "CODECOMPLIANCE - Work shall be done in a manner that is as minimally disruptive to the surrounding community as possible.Any work taking place not specifically approved by an extended hours permit will result in the revocation of this permit."
EHR21-0158 Access manhole to splice cable (A01ZLSX, A024KQB)- MH's 1314 & 2311.Equipment: N/AImpact: The impact on this job will be the closing on the slow lane on the traffic on La Brea Blvd .and may slow traffic flow . 8/9/21 - 8/12/21 10pm - 6am 7061-7099 Santa Monica Blvd "CODECOMPLIANCE - The work to be conducted in the intersection of Santa Monica Blvd and La Brea Avenue.Work shall be done in a manner that is as minimally disruptive to the surrounding community as possible.Any work taking place not specifically approved by an extended hours permit will result in the revocation of this permit."
EHR21-0160 ACCESS MH'S 1314 & 2311 (A024KQB) Equipment: N/AImpact: IMPACT TRAFFIC DUE TO LANE CLOSURE 8/12/21 - 8/20/21 10pm - 6am 7061-7099 Santa Monica Blvd "CODECOMPLIANCE - This permit is in continuation with EHR21-0158.Must follow the same imposed conditions."
EHR21-0161 Non-noisy work to be performed during the hours of 7am and 8am. (no equipment, no excavation no work noise) PH2 PH3 site landscape and irrigation, steel handrail, light fixtures, picnic tables and benches, ARC building finish painting, MEP Commissioning, electrical finish light fixtures, plumbing fixtures finishing wood flooring Gym. DUE TO COVID-19 ALL WORKERS MUST WEAR FACE MASK AND KEEP 6 FEET SOCIAL DISTANCE. 8/16/21 thru 9/10/21 (Mon. - Fri.; except Labor Day 9/6/21)) 7am-8am 8750 El Tovar "CODECOMPLIANCE - The contractor must abide by the approved construction hours. No construction work is allowed on Monday, September 6, 2021 (Labor Day).Work shall be done in a manner that is as minimally disruptive to the surrounding community as possible.Any work taking place not specifically approved by an extended hours permit will result in the revocation of this permit."
EHR21-0162 PH2 PH3 Park landscape and irrigation, electrical underground and light poles, ARC South final painting, flooring, light fixtures, Testing and balance MEP equipment for Commissioning, cleaning up. No truck material deliveries, No street traffic impact, no forklift or heavy equipment to be used. DUE TO COVID-19 ALL WORKERS MUST WEAR FACE MASK AND KEEP 6 FEET SOCIAL DISTANCE 8/14/21 thru 8/28/21 (Saturday ONLY) 8am-5pm 8750 El Tovar "CODECOMPLIANCE - This permit is valid for 08/14, 08/21/ and 08/28.No construction work on 09/04, Labor Day Weekend.The construction site must adhere to the approved construction hours.Work shall be done in a manner that is as minimally disruptive to the surrounding community as possible.Any work taking place not specifically approved by an extended hours permit will result in the revocation of this permit."